Small, factory-built rooms are a realistic option for operators who need to add rooms quickly without a long on-site build. The C08 Hotel Apple Cabin is one example.
1. Who this guide is for
This guide is for owners and developers of boutique hotels, eco-resorts, glamping and RV sites, scenic-area lodging, and creative parks. It also suits anyone comparing prefabricated rooms with a conventional build. Cymdin's Apple Cabin range uses a lightweight metal structure with no special foundation. Units can be disassembled, moved and reused, and they can be combined horizontally or vertically. That flexibility suits seasonal or phased projects, where rooms may need to be added, rearranged or relocated.
2. C08 core specifications
The C08 is a single-room unit with a bedroom, balcony and separated wet and dry bathroom. The same specifications appear on the C08 Apple Cabin Pod page.
| Item |
Published specification |
| External size (L × W × H) |
8.5 m × 2.25 m × 2.45 m |
| Building area |
19 m² (bedroom, balcony, dry-wet separated bathroom) |
| Occupancy |
2 to 4 people |
| Power capacity |
6 kW |
| Net weight |
About 3 tonnes |
| Main frame |
Hot-dip galvanized seismic steel structure |
| Shell |
2.5 mm aluminum veneer with fluorocarbon baked finish |
| Glazing |
Double-layer toughened Low-E glass, 6+12+6 |
| Stated wind and seismic rating |
Above grade 8 earthquake; above grade 12 typhoon |
| Service life |
Normal use over 20 years; design life 50 years |
| Installation |
Whole-unit lifting with fixed foot supports |
3. What the materials mean for a hotel
A spec sheet is only useful if you know why each item matters to daily operation. The table below translates each component into operator terms.
| Component |
Technical note |
Why it matters to operators |
| Galvanized steel frame |
Zinc coating protects the steel from corrosion. |
Longer structural life, especially in humid or coastal locations. |
| 2.5 mm aluminum with fluorocarbon coating |
Aluminum does not rust, and the coating resists staining. |
Exterior cleaning is simple, and repainting is needed less often. |
| Low-E double glazing (6+12+6) |
Two 6 mm panes with a 12 mm cavity; the coating reduces heat transfer and UV. |
Steadier room temperature and lower air-conditioning load. Curtains provide privacy. |
| Dry-wet separated bathroom |
The shower area is separated from the rest of the bathroom. |
Cleaner turnover and a more comfortable stay for two or more guests. |
| Smart lock and whole-unit control |
Electronic access and integrated controls. |
Supports remote check-in and lower staffing at scattered sites. |
4. A caution on "grade 8" and "grade 12"
The product page states resistance to earthquakes above grade 8 and typhoons above grade 12. Read these figures carefully, because they are easy to misinterpret.
In Chinese engineering practice, an earthquake "grade" or "degree" usually refers to seismic fortification intensity under the national seismic design code (GB 50011). It is not the same as moment magnitude. A typhoon "grade 12" corresponds to force 12 on the Beaufort scale, meaning sustained winds of at least about 32.7 m/s.
Outside China, a hotel must be approved against its local code, such as Eurocode 8 for seismic design in Europe or ASCE 7 for wind and seismic loads in the United States. Before signing, ask the manufacturer for calculation reports or test documents that match your local design wind speed, snow load and seismic zone. This is the most reliable way to protect your project. The manufacturer also notes that these local factors are what drive customization.
5. Planning a hotel layout with 19 m² units
A single unit is a standalone guest room, so the design questions are about clusters rather than one building. The footprint is only about 19 m², but you must also allow for walkways, parking, utilities and fire separation distances required by local rules. The figures below are simple arithmetic for early feasibility work, not design values.
| Number of units |
Combined unit footprint |
Total rated power |
Approximate net weight |
| 5 |
About 95 m² |
30 kW |
15 tonnes |
| 10 |
About 190 m² |
60 kW |
30 tonnes |
| 20 |
About 380 m² |
120 kW |
60 tonnes |
The power column is a straight multiple of the 6 kW unit capacity. A qualified electrical engineer will apply a diversity factor, since not every room draws full load at once. Confirm the supply, transformer size and cable routes early, because grid connection is often the longest lead-time item on a remote site.
6. Pre-order checklist
| Area |
What to confirm |
| Land and permits |
Zoning for tourist lodging, and whether local authorities treat the unit as a building, a temporary structure or a mobile unit. |
| Structure and climate |
Local wind speed, snow load and seismic zone, matched to documents from the manufacturer. |
| Fire safety |
Flame-retardant materials, smoke alarms, escape routes and spacing between units, checked against local fire rules. |
| Utilities |
Water supply, drainage or a treatment system, and electrical connection points at each unit. |
| Access and lifting |
Road width, crane position and ground condition at the site. |
| Guest experience |
Air conditioning, sound insulation between adjacent units, bedding, and the optional kitchen or bathroom fittings. |
7. Delivery, timeline and payment
The manufacturer offers two delivery methods. Choosing between them is a cost decision.
| Method |
Advantage |
Trade-off |
| Finished unit |
Ready to use once water and power are connected. |
Higher freight cost, because the unit needs frame-container transport. |
| Disassembled modules |
Lower freight cost, especially for bulk orders. |
Needs skilled on-site assembly; poor handling can affect quality. |
| Stage |
Published terms |
| Production |
About 45 days |
| Delivery |
20 to 35 days, depending on destination and holidays |
| Payment |
T/T: 50% deposit before production, 50% balance before shipment |
| Warranty |
1 year after receipt |
| Installation support |
Engineer guidance or local agents for larger projects, at extra charge; door-to-door (DDP) service is available |
In practice, production plus delivery adds up to roughly two to three months from deposit to arrival, before site preparation and commissioning. Run site work, permits and utility connections in parallel with production so the units do not sit waiting for the ground to be ready.
8. Where the Apple Cabin fits, and where it does not
The C08 works well for scattered lodging where each room is a separate cabin: scenic areas, glamping, lakeside or forest stays, and small resort extensions. Owners who want to test demand before committing to a large build may also find phased installation useful, because units can be added or moved later.
It is less suited to a large urban hotel that needs corridors, lifts, banquet halls and back-of-house areas. For projects of that kind, look at Cymdin's modular building range, which is designed for larger, multi-module structures, including hotels. A hybrid is also common: a conventional or modular main building for reception and dining, with Apple Cabins as guest rooms around it.
9. Frequently asked questions
Is the manufacturer a factory or a trading company?
Shanghai Cymdin Industrial Co., Ltd. states that it is a factory with more than 15 years of experience. It has produced enclosures and cabins since 2008 on a plant of about 5,800 square meters.
Can the design be adapted to my climate?
Yes. The manufacturer says it can add stairs, terraces, roofs, awnings and guardrails to suit local conditions, or produce to a customer's own design.
Which furnishings are included?
The standard fit-out covers wall, floor and ceiling finishing, curtains and a smart lock. Optional items include a kitchen (induction cooker, cabinets, sink), bathroom fittings with a smart mirror, and furniture such as a double bed, sofa, TV and refrigerator.
Which countries does the company export to?
The company lists exports to Australia, New Zealand, Indonesia, Thailand, the United States, the United Kingdom, Canada and other countries.